Home
> Capitol
Building
Nisqually Earthquake
On February 28, 2001 at 10:54 a.m., the Capitol
shook from the seismic power of the 6.8 magnitude Nisqually
earthquake. Centered a mere 17.8 kilometers northeast of Olympia, at
a depth of 52 kilometers, the earthquake caused considerable damage
to the Legislative Building and surrounding structures.
Within minutes after the earthquake struck, General
Administration’s crews were on site surveying the damage, making an
assessment of the building’s overall performance during the
earthquake, and aiding in the vacating process. Also, luckily, M.A.
Mortenson, the General Contractor/Construction Manager for the
planned rehabilitation project, had been hired that morning and had
crews on site helping with these operations.
However, complicating the
situation was the fact that the 56th Legislature was in full session
at the time of the earthquake. The building was at its full capacity
with 455 staff members and countless other visitors, lobbyists, and
tourists. The large number of surprised and at times frightened
people made for a difficult task to manage. But General
Administration’s crews directed this massive evacuation well and had
the entire building cleared within in minutes with no injuries
occurring.
Much concern was expressed regarding the dome’s
condition after the earthquake. The dome was the location of a
large-scale seismic upgrade directly after the 1969 earthquake, and
the capabilities of these upgrades had never been significantly
tested. But the dome performed remarkably well, as did the entire
building during the Nisqually earthquake. The damage was
substantially less than there was in comparable earthquakes of 1949
and 1965, due to the successful seismic upgrades and structural
enhancement efforts of 1949,1965, and 1976. There was no significant
damage to the primary structures that support the building.
The assessment noted:
- The lantern shows no signs of damage except for a
stone that fell
- The foundation for the dome and the walls in the
lower wings were not significantly damaged
- Stones were dislodged on the exterior colonnade
buttress but the structure behind them shows no significant damage
- The North and South Porticos show no sign of
stones being dislodged or structural damage
- None of the marble walls, except behind the
rostrum in the House Chamber, came loose or moved significantly.
- The Tiffany chandelier in the Rotunda did not
significantly move and does not show any signs of damage
The building’s structural elements came out of the
earthquake architecturally strong and without the need of
significant repair. However, exterior stonework was loosened, the
colonnade columns shifted, and interior plasters, fixtures, and
ceilings were all damaged. These ailments were to be repaired before
the Legislative Building could be reoccupied. Specifically:
- The colonnade buttress stones had to be secured
- 10 of the 16 columns in the colonnade had to be
secured with steel collars so that they would not fall in the case
of an eventual earthquake. These columns had moved up to 4 inches
during the earthquake.
- The ceiling supports in the House and Senate
Chambers needed slight repairs
- Some of the ornamental plaster needed to be
secured to prevent them from falling
- The wall behind the rostrum in the House Chamber
cracked and a marble panel became loose and both need to be
secured
- Several historic light fixtures became loose and
need to be taken down
- Modern light fixtures in the Senate Chamber
became loose and needed to be removed and replaced
- Plaster at the top of the columns in the State
Reception Room was damaged and needs to be repaired
Urgent repairs were completed in order for the
Legislature to reoccupy the building and complete the scheduled
session by mid-April. Additional repair work is still required along
with seismic retrofitting to protect the building from future
earthquakes. These repairs and structural upgrades have been
included in the general rehabilitation project that was already
conceived at the time of the earthquake. The cost for these
improvements has been estimated at about $10 million and will be
budgeted by the Federal Emergency Management Agency (FEMA) and state
matching funds. |